Queensland Alumina Ltd (QAL)
Gladstone
260 MW
installed power capacity
818.7 Gcal/h
installed heat capacity
The Novo-Ziminskaya CHPP began construction in 1974 as a subsidiary of a chemical combine. In 1980, the first power boiler was put into operation there. As the city grew, its demand for electricity increased as well. In 1990, Phase II of the CHPP was launched with the commissioning of the fourth boiler unit.
It is the newest power plant that belongs to En+.